Multilayer 8 layer mixed layup Via Filled and capped, back drilled hole of CISTELAIER S.P.A.

Product

 Multilayer 8 layer mixed layup Via Filled and capped, back drilled hole
  •  Multilayer 8 layer mixed layup Via Filled and capped, back drilled hole
Application: Telecom
Technology: Multilayer 8 layer mixed layup Via Filled and capped, back drilled hole
Material: FR4 High TG with filler + Rogers RO4350. Via Filled and capped, back drilled hole
Finishing: Enig

Description of the Product

Application: Telecom
Technology: Multilayer 8 layer mixed layup Via Filled and capped, back drilled hole
Material: FR4 High TG with filler + Rogers RO4350. Via Filled and capped, back drilled hole
Finishing: Enig

Price of the Product

Price not indicated

Category of the Product

Ask for a quote

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
*Mandatory fields